‘Zimbabwe needs broad surgical approach to ICT challenges

Zimonline
By Robert Ndlovu
Thursday 16 April 2009

OPINION: Information and Communications Technology (ICT) is an umbrella term that includes all technologies for the manipulation and communication of information.

Recently the Minister of ICT, Nelson Chamisa announced a need for a national website, in order to put Zimbabwe back on the global map.

It was an important stance by the Hon Minister in so far as it showed top-level awareness that something needs to be done to bridge the digital divide in Zimbabwe.

Zimbabwe already has thousands of websites that are either hosted locally or outside the country. So it’s not so much about the need of a national website per se but rather a broader surgical approach to the ICT challenges that we face.

The digital divide or gap is set to widen even further if we do not take it upon ourselves to come up with specific solutions for our specific challenges.

Problem resolution at this level, calls for a sober, firm and accurate understanding the variance between what is on the ground and what needs to be achieved.

Any half-baked attempts to address the digital divide or gap will not only waste resources and opportunities but also literally take the nation a few decades backwards in terms of development.
A sound ICT policy impacts all sectors of the country – from the economy through health right up to mining and farming.

Here I would like to offer a bird’s eye view of key issues that impact and affect digitalisation efforts. Hopefully this will help the ICT leadership clarify, categorise and prioritise delivery mechanisms.
Zimbabwe, just like most African countries basically faces a number of hurdles in order to roll out effective computing technologies to the general population.

Rollout issues and challenges do include but are not limited to cost of computers and equipment, inadequate access technologies (data & voice), inadequate electricity, poor national and international bandwidth, regulation and licensing, censorship and control, brain drain and lack of skilled manpower and IT certifications, poorly designed and optimised websites, and e-governance.

In this article I address some key elements that affect Internet penetration and telephone usage. You will note that the main factors that affect telephony also affect data communications.

ICT has challenges in both the data and voice arenas. When we talk about bridging the digital divide we seek to reduce or eliminate entry barriers that the people face in both data and voice.

A number of terms will be used loosely in both areas. It is important however, for the ICT ministry to be able to dissect and separate common issues and independent issues that affect data and voice.
This approach is necessary so that the issues are addressed at root cause level. We seek to deal with the root problem like inadequate infrastructure manifested symptomatically as congestion or slow connections.

Voice and data networks are fast converging and this calls for a smart unified communications approach whose success hinges on reliable, fast and robust network infrastructure.

In Zimbabwe, just like in many African countries most people who access the Internet do so via cyber cafes, colleges, varsities, work place and quite a few do so at home.

The limiting factors are basically cost and unavailability. Most urban dwellers either cannot afford it or the Internet Service Providers (ISPs) serving them are out of capacity as discussed further below.
There are people who own farms who could easily afford it, but cannot do so from where they are because there is no network coverage of one form or the other in their area.

As a result Internet penetration is very low due to a number of issues. One of ICT’s core tasks is to help present operators unclog their stuffed networks and also adopting the concept of cyber cafes for many communities whose chance of using a computer or accessing the internet are next to none.
Donating computers to schools is great. More could be done in the form of setting up computer centres at libraries, district offices and all colleges using the cyber café approach.

This has the advantage of also spinning some business to the struggling ISPs. Hopes are hinged on the 3G data access. All I can say for now is that we hope Econet will not make it an elite service for the business brass.

Last year when I was in South Africa I was pretty impressed about how easy it is to connect to the Internet through MTN’s 3G using a USB dongle with a 3G capable SIM card.
Because right now in Zimbabwe before we even have 3G, is it possible to walk to a distribution shop and buy a SIM card?

Telephone access

Teledensity is a metric that is used to broadly estimate the number of telephone lines per 100 individuals.

Presently, Zimbabwe has a teledensity of about 3. This means that there are about 3 telephone lines per 100 people in Zimbabwe.

This figure heavily depends on the accuracy of the actual number of telephone lines divided by the total population. Now this is a very tricky estimation as millions of Zimbabweans have left the country while mobile operators have availed more lines.

The teledensity metric has been used as an indicator of economic development or governance.
Current voice providers include TelOne, NetOne, Econet and Telecel.

Now wireless usage in Zimbabwe has indeed enabled many people a means of communication. Wireless growth rate is highest in Africa because cellular phones offer any one within coverage range an equal opportunity to communicate.

At this stage Zimbabwe has serious complications that basically point to a collapsed economy. Cellular operators have managed just to stay afloat in a very un-business like environment. This has made it impossible for the operators to increase both capacity and coverage at a time when spares and maintenance were made in hard currency whilst end users were paying in a currency that had long lost its value.

Stabilisation of the economy should allow cellular companies to increase their coverage to more areas.

Cost of computers, equipment and software

Computer and Internet penetration is very low in Zimbabwe due to the cost of owning a PC or MAC and the cost of having an Internet connection.

What is needed in this area is for the stakeholders to identify equipment manufactures that can supply the Zimbabwean market with PCs in bulk and at competitive rates.

Secondly, in most developed nations people throw away their PCs just to get a new one. Most of these PCs are recyclable and the ministry can set up collection centres in the United States and United Kingdom to pick these PCs – clean them up and store them in a container before shipping them to Zimbabwe. This is already being done in Kenya and Ghana.

Thirdly, the ministry should encourage local companies to team up with PC manufactures and open up assembly plants in Zimbabwe. This should be one of ICT’s long-term plan and has bankable off shoot benefits like job creation, local availability of PCs, generation of forex through exports and generation of revenue for the state via the taxman.

The more people have access to PCs whether publicly via schools, libraries or Internet cafes the better.

One way of doing this is availing mobile digital libraries. Take an old ZUPCO bus. Refurbish it, install say 30 computers in the bus and pull a diesel-powered generator at the back.

These mobile libraries are used in Rwanda to visit remote areas with no PC access.

Windows based software is generally pricy because of licensing fees. The ICT ministry must encourage and even fund open source software initiatives in Zimbabwe.

This literally means that refurbished computers that are shipped into Zimbabwe can run on free but extremely loaded Linux based like uBuntu.

uBuntu is a community developed operating system that is perfect for laptops, desktops and servers. uBuntu comes loaded with thousands of FREE open software applications like word processing, spreadsheets, presentations, databases, web servers, email servers, fax servers, call centres, phone billing, internet café billing, hotel reservation, project management, programming tools, educational and scientific software and many more.

The cost of software cannot be a stumbling block in ICT development.

Electricity

All ICT gadgets use electricity to function. Inadequate power generation and unreliable transmission and distribution capacity has a direct impact on ICT development strategies.

This means that there can be no meaningful digital revolution if there is no electricity, full stop.

This calls for an elevated sense of urgency to resuscitate and improve power generation, transmission and distribution capacity.

It is too obvious that Zimbabwe has to explore and improve the present forms of power generation methods that may include but NOT limited to water, solar, wind, biogas and even nuclear energy.
Mail servers, web servers, routers, switches, base stations etc all need electricity to operate. So before we even worry about creation of a national website, it is necessary that we have adequate electricity to power the servers that will serve the web pages!

If people cannot access the website because the hosting ISP has experienced a power outage, then our problems are a lot wider and complex to be solved by having a national website.

Now erratic power supplies has made life horrible for ALL telcos or ISPs as they are forced to install alternative power sources, mainly diesel-powered generators.

This has pushed up operation costs for all companies. Notwithstanding that the diesel in question was at one stage scarce and only available via the black market. This is one of the many problems that have pushed the price of the service as soon as use of forex was officially approved.

Access technologies

Lack or unavailability of telecommunications infrastructure makes it difficult for remote areas to access e-services like the Internet or even basic email. Some farmers can afford PCs but they cannot access the Internet because either the telephone infrastructure is nonexistent, broken down or unreliable in their areas.

This points back directly to telco providers TelOne, Econet, NetOne, Telecel, Transmedia, Powertel, Africom, Ecoweb, ZOL, Mweb and Telecontract just to mention the main players.

It is very tough for these fellows to maintain their network infrastructure because of overheads like electricity for plants and base stations.

That aside, there is need for Zimbabwe to pursue more rigorous wireless last mile connection technologies like Wi-Max, Wi-Fi, 3G, CDMA etc. Already Powertel and TelOne are involved in CDMA rollouts in and around Harare.

National & International Bandwidth

Notwithstanding the limited access technologies available by remote stations to access e-resources, there is the question of available national and international bandwidth.

Your connection speed to you ISP might be 56k but the speed with which you access local and international websites will solely depend on the available capacity on the network you are connecting to.

It means that to pull a page from Harare ISP will depend on the traffic congestion between your access point to the web server which heavily relies on the number of connections made to that site.
Failure to connect to your ISP might be caused by total capacity of the access network to handle your call.

This is a national bandwidth issue. Zimbabwe has limited access points and this literally means a lot of people are competing to gain access to a thin pipe.

I am sure you know how frustrating it is to try and drive your new BMW in a very congested road with potholes!

To access emails from the web you will send a request via your ISP who will in turn forward your request to your email hosting service.

Now the issue of contentions comes into the picture again with internationally hosted sites. You have to compete with other users from your ISP and other ISPs to access websites via the international gateway that maybe a satellite dish in Mazowe!

So international access bottlenecks add to the other national bandwidth woes caused by few POPs (point of presence).

What is needed then is an increase in access points and using thicker bandwidth pipes between these POPs. Between main centres Zimbabwe uses fibre optics as the backbone. Also satellite alone cannot meet Zimbabwe’s bandwidth needs.

ICT must look into ways of connecting via fibre to the undersea cable in the Indian Ocean. The cables at the sea connect to the rest of the world at lightning speed. Why fibre? Fibre has a higher carrying capacity. A fair comparison between using copper wires and fibre would be comparing a wheelbarrow to a haulage truck to carry 100 tons of sand.

In a nutshell ICT needs to do some audit of both the national and international bandwidth info. This audit will point out major bottlenecks that choke Internet usage in Zimbabwe.

The solution after the audit should include amongst other things the following fibre network links: – Harare to Mutare to provide a link the Indian Ocean under sea cables in Beira. I am reliably informed that AfriCom is doing this project already.

– Bulawayo to Beitbridge to provide high-speed link to SA fibre network. South Africa is Zimbabwe’s largest trading partner. Having multiple gateways will assure and ensure that Zimbabwe does not experience total black out associated with network failure.

Investing in fibre optics today is not an option but a must.

Broadband Access

To address the slow speed and low bandwidth challenges that Zimbabwe faces, all efforts MUST point into the availing of broadband access.

The term broadband commonly refers to high-speed Internet access. Technically this refers to data transmission rates of at least 200 kilobits per second.

When you connect to your ISP you have two values that you deal with, download speed (down stream) and upload speed (up stream). As the names suggest, down streams refers to the data transfer rate when you are pulling resources from the Internet to you PC like downloading email, downloading software, listening to music or watching a video from Youtube.

Up stream refers to the data transfer rates when you are pushing or publishing content from you PC to the Internet. Examples here include sending email, posting your profile to Facebook and publishing your website.

Pull and push

In general most Internet users pull rather than push to the Internet and as a result the rates of downstream rates are higher than up stream rates. Broadband allows a higher data transfer rates than dial up rates.

An interesting comparison would be that of trying to empty a 200l drum of water using a hosepipe or a drinking straw!

Types of broadband technologies

The term broadband describes the data transfer rates but does not describe the underlying technology (physical and data link layer) used to achieve high data transfer rates.

The main broadband technologies are briefly summarised below. – DSL (Digital Subscriber Line) is a wireline transmission technology that transmits data faster over traditional copper telephone lines already installed to homes and businesses.

– Coaxial cable makes use of cable modem service, enabling cable operators to provide broadband using the same coaxial cables that provide cable TV
– Fibre optic technology converts electrical signals carrying data to light and sends the light through transparent glass fibres about the diameter of a human hair.
– Wi-Max , Worldwide Inter-operability for Microwave Access, is a telecommunications technology that provides wireless transmission of data using a variety of transmission modes, from point-to-multipoint links to portable and fully mobile Internet access.

The technology provides up to 72 Mbit/s symmetric broadband speeds without the need for cables. This is the way to go especially for metropolitans. The technology is based on the IEEE 802.16 standard (also called Broadband Wireless Access).

– 3G networks are wide-area cellular telephone networks that evolved to incorporate high-speed Internet access. Theoretically data rates approach 14.4 Mbps downstream and 5.8Mbps upstream.
Econet already has the 3G licence in Zimbabwe and we await its delivery. The other 3G licence was granted to Powertel using CDMA. This service is only limited to Harare.
– CDMA – Wireless landlines using Wireless Local Loop 450 MHz system used as last mile connection by TelOne in the wake of copper cable thefts and shortage. Only available in Harare, Chitungwiza & Ruwa.
– Satellite broadband is another form of wireless broadband, also useful for serving remote or sparsely populated areas. This technology basically uses satellite dishes pointed to the sky to connect to a geo-stationery satellite orbiting above the earth.
– Broadband over Powerline (BPL) is the delivery of broadband over the existing low and medium voltage electric power distribution network.

Broadband is always on, does not block phone lines and there is no need to reconnect to network after logging off.

Summarily connection bottlenecks exist at an access level, national bandwidth level before you even look at the international portion of the game. What we need is a bottom up approach and not top to bottom approach.

So after rolling broadband access architecture, the national network connecting to the international network MUST not act as a bottleneck.

A typical scenario in most African countries is that you can use Wi-Fi to connect your laptop to your access point at 54 Mbps! WOW that’s a lot!

Nope. If the connection from your ISP to the Internet is 56kbps then your broadband connection speed to your access point is NULL & VOID.

Regulation/Monopoly/Licensing

Most African governments really put a tight lid when it comes to regulation of telecommunications and media. That alone is a major obstacle in reducing the digital divide. For some strange reason or another most African governments, via the regulatory bodies, tend to become an obstacle to innovation and development.

Part of the fear is unfounded in that some authorities fear that opening up the telecommunications will either threaten government owned establishments or also fear of not being able to control information flow.

Of course this is insane. Only those who do evil stuff should be worried about a liberal telecommunications environment.

Naturally national security is a top priority for the regulation body. I must mention that of late POTRAZ has indeed tried to catch up with reality as I am aware that a few more companies have been granted different licences to operate different technologies in data, voice and wireless arenas like Econet doing 3G and AfriCom getting engaged in VoIP.

Considering that some of the operators who have monopolies have failed to meet their service obligations to provide reliable and affordable communications, the ICT ministry should explore ways of allowing smart partnerships between ISPs with local authorities/communities to provide telco service for their areas.

For instance, if the wireless company cannot afford to put a base station in my home area in Jambezi or Lower Gweru, smaller operators must be allowed to run and own base stations in such areas and share the profit with the backbone operator.

What I mean is at a district centre, small operators will install a base station, a data link and a power generator if need be. Then connect to the big operators switch via Wi-Max or microwave.

These small operators can’t afford to do a national rollout so they can manage to setup their own base stations for their respective areas and then connect to the main carrier. How the revenue from that base station is shared can then be worked out.

These are the ideas that ICT should be researching and establishing their viability potential.
TelOne, Powertel and Transmedia

These three companies enjoy unmatched monopolies based on their origins or parenting company namely PTC, ZESA and ZBC. These three companies have a combined capacity to reach all corners of Zimbabwe by virtue of their infrastructural inheritance for both data and voice.

The ICT ministry must carry out very thorough performance audits of these companies. It is an open secret that their failure is mainly due to political meddling and interference, which makes them operate more like social clubs than companies.

Despite their failure for years to provide adequate telephone services, electricity, radio and TV services these companies have moved into the Internet market with remarkable speed.

It is not clear why National Railways of Zimbabwe (NRZ) has not conceived a telco business unit based on their own data network for the rail system. Well Transtel would be a great idea but likely to be plagued by the same virus that affects its other three cousins.
Licensing and external investment
The issue of regulation will not be complete if no mention is made of the prohibitive nature of the licensing fees in the range of several million US dollars.
What makes it even more complicated is that should one wish to partner with a foreign investor, the imposition of fixed percentages for local ownership stake makes this really look like a circus.
Which sane investor is interested in investing in an environment where he/she is expected to invest more dollars but get the minority share? Fifty-one percent local stake sounds really attractive and nationally correct since indigenisation is the core agenda of empowering locals.
That however does not mean replacing common sense with hollow pride which has so far worked negatively against Zimbabwe. Pride alone has never fed any nation.
– Wi-Fi
It appears that the ruling in the 90s to ban or restrict use of ISM frequencies 2.4 GHz and 5Hgz was not meant to protect scientific equipment used in hospitals from interference but a strategic move to monopolise the bandwidth to Transmedia.
It is the national broadcaster of television, radio and Internet access services in Zimbabwe on the afore mentioned frequencies. So one wonders what suddenly happened to hospital equipment protection.
Transmedia owns and operates all terrestrial broadcast infrastructures and as a new strategic business unit of ZBC it bridged VHF and IP so as to tap into wireless access.
Because of monopoly of this frequency band, wireless broadband has not grown as expected. I doubt if Transmedia has more than 800 customers with their tower located at Pockets Hill with no line of sight complication.
The ICT ministry together with POTRAZ must revisit the maximum power levels for Access Points to allow other players to beam data and voice over using 2.4 GHz and 5 GHz (Wi-Fi).
This will go a long way in enabling ISPs to connect more people using wireless broadband. Right now ISPs are trapped between a rock and a hard place as their last mile connection solution is limited mainly to twisted copper wires since both 2.4 GHz and 5 GHz are locked down to one provider, Transmedia.
Voice over Internet Protocol (VoIP)
Voice over IP is still a grey area in Zimbabwe. Obviously its success depends on reliable network infrastructure. With 3G on its way, POTRAZ should allow people to connect over IP and make calls.
Also a smart combination of wi-max and wi-fi can bring voice to many people that presently have NO hope of getting a TelOne line via copper or wireless CDMA. Businesses and organisations might be forced to install satellite dishes and then use their IP connectivity for both data and voice and bypass the national operators because they can’t get service from them!
Besides the obvious use of VoIP for voice, other spin offs can be realised in Zimbabwe like the deployment of call centres. This allows local companies to generate employment for the local community, generate scarce forex and revenue for the state in taxes.
Presently most favored call centre destinations are India, Malasyia, Philippines and of late Kenya and South Africa – thanks to their open VoIP policy.
VoIP opens so many avenues of communication between end users. For instance through use of open source PBX like Freeswitch, one can easily provide free voicemail mail service.
This is how it works. A Linux server running a PBX is a capability of creating infinite user extensions. So a particular user can sign up and be assigned an extension say 600244 and a PIN code – 9561. Now this user will have to call an access number say 011 800 600 to check and or send voicemails. If he does NOT have a personal phone this user can still use any phone just to retrieve his messages from the system.
So in short this person can advertise whatever business he is in and then specify his details as “Please call me on 011 800 600 ext 600244”. Callers will be greeted by an interactive voice response system that will ask them if they want (1) to check messages or (2) to send a message to another user.
Brain Drain & Skilled Manpower
The effect of brain drain on the digital revolution is obvious. As the country continues to lose more and more skilled and trained personnel, it becomes difficult for the nation to move forward in an attempt to turn around the economy. This applies to all sectors of the economy and not just ICT.
The GNU should be creative enough and try and lure skilled personnel back by coming up with well thought out “come back home schemes”. I am talking about highly trained professionals from all walks of life.
Trust me there are thousands of Zimbabweans in and outside the country prepared to help rebuild the country. The question of patriotism comes up. Ask what you can do for Zimbabwe and not what Zimbabwe can do for you? That’s fair enough.
Trust me most skilled professionals would not mind an incentive in the form of some small piece of land somewhere in Mvurwi or Insiza, if we expect to lure patriotic professionals to leave their well paying jobs at Cisco or Microsoft or BT and join the ICT in Zimbabwe. Patriotism is a two-headed beast.
ICT training & Certification
ICT training and development has not been spared the economic wrath that affects the whole country. As part of a long-term plan Zimbabwe’s ICT ministry must look into establishing more ICT-based institutes and academies as part of the digital empowerment plan.
Software programming is particularly one area in which ICT must look. Writing a computer code requires very few resources other than a computer and programming knowledge of certain languages like C++, Java, Python, Perl etc.
What is needed is that the ministry of ICT at a government level must travel to India and strike deals to have Indian programmers come and train students at various training academies in the country.
Software is a great product that is easily exported. This is where the Hon Minister should be setting his eyes as a long-term plan.
There is need to promote establishment of MORE academies that can provide ICT certifications that include but NOT limited to A +, N+, Security +, Linux +, Cisco etc.
Web Presence, Promotion and Optimisation
Designing and placing a website on the Internet is very simple and straightforward. But what matters is whether the website has been designed properly and optimised well so that it is searchable on the Internet. People use search engines to look for information, products and services.
A poorly developed website will affect that website’s visibility on the Internet. Most search engines like Google, Yahoo, MSN and Dogpile use various algorithms to rank websites.
The key in making our website visible includes search engine optimisation. This involves items like: – using certain key words in your website title and header and also depends on the number and quality of links on your web page, the actual content and relevance of your web pages, registering your website with different search engines.
Linking out to other websites and have them linked back to you is useful in making your website visible on the Internet.
A good website must be able to retain visitors and even encourage future visits. A good website must not only disseminate information to its visitors but must be able to call the visitors to action. Like “click here to subscribe for free reports” or “click here to place a donation“ or “click here to get a call back from us” or “enter your cell phone number here to receive promotional info via SMS” etc.
This makes the website interactive and not static.
Website Standards
Zimbabweans are a very tech-savvy people. You don’t need to look far. Zimbabweans based both in Zimbabwe and outside run fairly successful websites ranging from news and media through money and shipping services right up to digital telephony services.
News websites dominate the number of websites run by Zimbabweans on the Internet. Since Zimbabwe government ministries and departments already have dozens of websites that are hardly searchable on the web, the ICT ministry must come up with a minimum standard guideline for website deployment.
Different ministries and departments do run their different websites, but some minimum quality standard or benchmark MUST be created by the ICT ministry.
If you look at the different Zimbabwe government websites, you will see varying designs which are not up to scratch, if I could be generous with my comments.
What is needed is a compliance standard that is set up by the ICT ministry.
Hats off to the webmasters who have managed to setup theses websites with little or NO training and resources. What needs to be done is to come up with a government website policy that clearly sets standards of design technique, layout, interactivity, promotion and optimisation.
e-Government
In 2005 an ICT Steering committee produced a detailed 124-page e-Readiness report. This report, sponsored by UNDP, covered almost all aspects of e-readiness like: – eAgriculture, eCommerce, eEducation, eMining, eHealth, eGovernance, eGovernment, eManufacturing and eTourism.
The ICT ministry must start by studying the eReadiness survey report (2005) and use it as a springboard to kick-start the digital dream. The report is detailed and thorough but might need to be updated in order to keep abreast with current ICT realities on the ground.
Then the ICT ministry must put together a team/board by pooling together highly skilled, competent and experienced individuals just as the Education Ministry did.
The Hon Education Minister David Coltart is a lawyer by profession and made a smart decision of putting together a board of education experts to execute the technical aspects of the challenges facing education in Zimbabwe.
This approach could be used by all GNU ministers so that the best brains, hands and hearts are pooled together to achieve a common purpose.
I must mention here that I deliberately did NOT discuss previous efforts by the government to censor, control and intercept Internet and voice traffic in the spirit of the inclusive government. Comments, corrections, questions and requests are most welcome. – ZimOnline

%d bloggers like this: